What ΑΕΚΚ is and what counts as ΑΕΚΚ
ΑΕΚΚ stands for Απόβλητα Εκσκαφών, Κατασκευών και Κατεδαφίσεων: waste from excavation, construction and demolition. The definition sits in article 3 of Law 4819/2021. Concrete is only a part of it. ΑΕΚΚ covers whatever comes out of a building when it is built, renovated or demolished.
| Code | What it covers |
|---|---|
| 17 01 | Concrete, bricks, tiles, ceramics |
| 17 02 | Wood, glass, plastic |
| 17 03 | Bituminous mixtures |
| 17 04 | Metals: iron, pipes, cables |
| 17 05 | Soil and stones from excavation (17 05 04 when not hazardous) |
| 17 06 | Insulation materials and materials containing asbestos |
| 17 08 | Gypsum-based materials, such as plasterboard |
| 17 09 | Other mixed construction waste |
Look at line 17 06. Asbestos is hazardous waste and never goes in a rubble skip. Read the asbestos guide before you touch old corrugated sheets or insulation.
What the law says
Two texts govern ΑΕΚΚ: Joint Ministerial Decision 36259/1757/Ε103/2010 and Law 4819/2021, the general waste framework. The law makes the contractors of public and private works the ΑΕΚΚ managers, or the owner of the works if no contractor has been appointed.
- Sorting at source. Article 30 of Law 4819/2021 brings in selective demolition for every kind of structure. Materials have to be separated into at least wood, inorganic fractions (concrete, bricks, tiles, ceramics), stone, metals, glass, plastics and gypsum. The article sets no minimum in square metres or tonnes. Any limits that apply to your job are in the conditions of your permit, and your engineer can tell you.
- Handing over to a system. Whoever is responsible for the works signs a contract with an approved ΣΣΕΔ ΑΕΚΚ for the waste they produce. On large projects with an environmental approval, soil and stones 17 05 04 follow the terms of that approval.
- Recovery target. Article 25 requires at least 70% by weight of non-hazardous ΑΕΚΚ to be prepared for re-use, recycled or recovered. Natural materials coded 17 05 04 do not count.
- A traceable chain. From 1 January 2023 treatment plants need certified scales, vehicles carrying ΑΕΚΚ need GPS, and skips are registered and marked with identifying details. So every load leaves a trail.
Penalties have a page of their own: fines for rubble.
What a ΣΕΔ and a ΣΣΕΔ ΑΕΚΚ are
A ΣΣΕΔ ΑΕΚΚ is a collective alternative management system, approved by the Hellenic Recycling Agency (ΕΟΑΝ). Under a contract, it arranges the collection and recycling of the responsible party's ΑΕΚΚ and issues the receipt of delivery.
The systems are regional, and each covers particular prefectures or regional units. At the last update we read (24 May 2024), the ΕΟΑΝ ΑΕΚΚ page listed 13 active systems. The current list is on the ΕΟΑΝ page, and that is where you check which system covers your area. We name none of them, because the list changes.
The responsible party picks the system. A contractor usually has a contract with one already. Without a contractor, the owner signs it, with the engineer's help.
The ΣΔΑ: what it is and when it is filed
The ΣΔΑ (Στοιχεία Διαχείρισης Αποβλήτων, waste management data) is a form that says what kind of ΑΕΚΚ the project will produce, roughly how much, and where it will end up. It goes in before the works start, with the building permit file on the e-Άδειες system.
The duty comes from article 7 of Joint Ministerial Decision 36259/1757/Ε103/2010 and from articles 40, 41 and 47 of Law 4495/2017, as amended. ΕΟΑΝ has also published a spreadsheet for recording the figures (on its ΑΕΚΚ page).
The engineer who prepares the permit completes the ΣΔΑ from the project data: floor area, type of works, quantities. You do not write it. You sign the contract with the ΣΣΕΔ, which goes into the file. If the works produce no rubble, the engineer files a declaration instead.
Which jobs need it and which do not
| Job | ΣΔΑ and ΣΣΕΔ contract? | Where the rubble goes |
|---|---|---|
| New build with a building permit | Yes | A licensed ΑΕΚΚ plant, with a receipt of delivery |
| Demolition with a permit | Yes | A licensed ΑΕΚΚ plant, with materials sorted |
| Renovation with a small-scale works approval | Yes, if it produces rubble | A licensed ΑΕΚΚ plant, with a receipt of delivery |
| Bathroom or kitchen with no permit at all | No ΣΔΑ, as there is no permit file. The rubble still goes to a licensed ΑΕΚΚ plant. Nobody asks you for a paper, because the carrier handles it | A licensed ΑΕΚΚ plant, never a stream bed or a field |
The last row trips up a lot of people. With no permit there is no ΣΔΑ, and nobody asks you for a paper. The rubble is still ΑΕΚΚ, though, and it has to end up at a legal facility. For how much rubble a job produces, see the renovation guide.
The Electronic Waste Registry (ΗΜΑ)
The ΗΜΑ is the registry of the Ministry of Environment and Energy, where businesses that transport and handle waste are listed. Owners do not register. The carrier and the plant must. The guide to the legal waste carrier explains how to check this and what to ask the company.
The owner's steps, in order
| When | What you need | Who issues it |
|---|---|---|
| Before the permit | Choose a ΣΣΕΔ ΑΕΚΚ that covers your area | You or the contractor, from the ΕΟΑΝ list |
| Before the permit | A signed contract with the ΣΣΕΔ | The ΣΣΕΔ, and you sign it |
| With the permit | ΣΔΑ in the file on e-Άδειες | The engineer |
| During the works | Sorting the materials and taking the rubble to a legal plant | The contractor or you, with a skip from a legal company |
| During the works | A delivery note and an invoice for every load | The skip company and the plant |
| At the end | Receipt of delivery (βεβαίωση παραλαβής ΑΕΚΚ) | The ΣΣΕΔ |
| At the end | Handing the receipt to the building authority so the permit can be closed | The engineer |
Keep every delivery note and invoice. The receipt is issued from them, and without them it cannot be.
Where the skip fits in
The skip is the link in the chain you can see on the pavement. Rubble from our skips goes to a licensed ΑΕΚΚ recycling plant, and each load leaves with its details.
The skip from your property
Licensed ΑΕΚΚ facilityThe load is sorted
- Concrete, bricks, tilescrushed into recycled aggregate
- Metal and timberrecycling
- What is leftlandfill
If you need papers for a permit, tell us when you book, in the order comment or in the chat. Say which document you want and the name and address to issue it to. Sizes and prices are under skip hire prices. If a contractor runs the job, the guide for builders and tradesmen is worth a look too.