ΑΕΚΚ: what it is, the ΣΔΑ and what a building permit needs

ΑΕΚΚ (AEKK) is construction and demolition waste: rubble and everything else that comes out of digging, building and pulling down. Whoever carries out the works, the contractor or, if there is none, the owner, has to hand it to an approved collective management system (ΣΣΕΔ ΑΕΚΚ) and be able to prove it. On a building permit this goes in the waste management data (ΣΔΑ), and the job is closed at the end with a receipt of delivery.

Updated:

Piles of crushed recycled aggregate and a crusher at a construction waste plant

What ΑΕΚΚ is and what counts as ΑΕΚΚ

ΑΕΚΚ stands for Απόβλητα Εκσκαφών, Κατασκευών και Κατεδαφίσεων: waste from excavation, construction and demolition. The definition sits in article 3 of Law 4819/2021. Concrete is only a part of it. ΑΕΚΚ covers whatever comes out of a building when it is built, renovated or demolished.

CodeWhat it covers
17 01Concrete, bricks, tiles, ceramics
17 02Wood, glass, plastic
17 03Bituminous mixtures
17 04Metals: iron, pipes, cables
17 05Soil and stones from excavation (17 05 04 when not hazardous)
17 06Insulation materials and materials containing asbestos
17 08Gypsum-based materials, such as plasterboard
17 09Other mixed construction waste
Examples from chapter 17 of the European Waste Catalogue

Look at line 17 06. Asbestos is hazardous waste and never goes in a rubble skip. Read the asbestos guide before you touch old corrugated sheets or insulation.

What the law says

Two texts govern ΑΕΚΚ: Joint Ministerial Decision 36259/1757/Ε103/2010 and Law 4819/2021, the general waste framework. The law makes the contractors of public and private works the ΑΕΚΚ managers, or the owner of the works if no contractor has been appointed.

  • Sorting at source. Article 30 of Law 4819/2021 brings in selective demolition for every kind of structure. Materials have to be separated into at least wood, inorganic fractions (concrete, bricks, tiles, ceramics), stone, metals, glass, plastics and gypsum. The article sets no minimum in square metres or tonnes. Any limits that apply to your job are in the conditions of your permit, and your engineer can tell you.
  • Handing over to a system. Whoever is responsible for the works signs a contract with an approved ΣΣΕΔ ΑΕΚΚ for the waste they produce. On large projects with an environmental approval, soil and stones 17 05 04 follow the terms of that approval.
  • Recovery target. Article 25 requires at least 70% by weight of non-hazardous ΑΕΚΚ to be prepared for re-use, recycled or recovered. Natural materials coded 17 05 04 do not count.
  • A traceable chain. From 1 January 2023 treatment plants need certified scales, vehicles carrying ΑΕΚΚ need GPS, and skips are registered and marked with identifying details. So every load leaves a trail.

Penalties have a page of their own: fines for rubble.

What a ΣΕΔ and a ΣΣΕΔ ΑΕΚΚ are

A ΣΣΕΔ ΑΕΚΚ is a collective alternative management system, approved by the Hellenic Recycling Agency (ΕΟΑΝ). Under a contract, it arranges the collection and recycling of the responsible party's ΑΕΚΚ and issues the receipt of delivery.

The systems are regional, and each covers particular prefectures or regional units. At the last update we read (24 May 2024), the ΕΟΑΝ ΑΕΚΚ page listed 13 active systems. The current list is on the ΕΟΑΝ page, and that is where you check which system covers your area. We name none of them, because the list changes.

The responsible party picks the system. A contractor usually has a contract with one already. Without a contractor, the owner signs it, with the engineer's help.

The ΣΔΑ: what it is and when it is filed

The ΣΔΑ (Στοιχεία Διαχείρισης Αποβλήτων, waste management data) is a form that says what kind of ΑΕΚΚ the project will produce, roughly how much, and where it will end up. It goes in before the works start, with the building permit file on the e-Άδειες system.

The duty comes from article 7 of Joint Ministerial Decision 36259/1757/Ε103/2010 and from articles 40, 41 and 47 of Law 4495/2017, as amended. ΕΟΑΝ has also published a spreadsheet for recording the figures (on its ΑΕΚΚ page).

The engineer who prepares the permit completes the ΣΔΑ from the project data: floor area, type of works, quantities. You do not write it. You sign the contract with the ΣΣΕΔ, which goes into the file. If the works produce no rubble, the engineer files a declaration instead.

Which jobs need it and which do not

JobΣΔΑ and ΣΣΕΔ contract?Where the rubble goes
New build with a building permitYesA licensed ΑΕΚΚ plant, with a receipt of delivery
Demolition with a permitYesA licensed ΑΕΚΚ plant, with materials sorted
Renovation with a small-scale works approvalYes, if it produces rubbleA licensed ΑΕΚΚ plant, with a receipt of delivery
Bathroom or kitchen with no permit at allNo ΣΔΑ, as there is no permit file. The rubble still goes to a licensed ΑΕΚΚ plant. Nobody asks you for a paper, because the carrier handles itA licensed ΑΕΚΚ plant, never a stream bed or a field

The last row trips up a lot of people. With no permit there is no ΣΔΑ, and nobody asks you for a paper. The rubble is still ΑΕΚΚ, though, and it has to end up at a legal facility. For how much rubble a job produces, see the renovation guide.

The Electronic Waste Registry (ΗΜΑ)

The ΗΜΑ is the registry of the Ministry of Environment and Energy, where businesses that transport and handle waste are listed. Owners do not register. The carrier and the plant must. The guide to the legal waste carrier explains how to check this and what to ask the company.

The owner's steps, in order

WhenWhat you needWho issues it
Before the permitChoose a ΣΣΕΔ ΑΕΚΚ that covers your areaYou or the contractor, from the ΕΟΑΝ list
Before the permitA signed contract with the ΣΣΕΔThe ΣΣΕΔ, and you sign it
With the permitΣΔΑ in the file on e-ΆδειεςThe engineer
During the worksSorting the materials and taking the rubble to a legal plantThe contractor or you, with a skip from a legal company
During the worksA delivery note and an invoice for every loadThe skip company and the plant
At the endReceipt of delivery (βεβαίωση παραλαβής ΑΕΚΚ)The ΣΣΕΔ
At the endHanding the receipt to the building authority so the permit can be closedThe engineer

Keep every delivery note and invoice. The receipt is issued from them, and without them it cannot be.

Where the skip fits in

The skip is the link in the chain you can see on the pavement. Rubble from our skips goes to a licensed ΑΕΚΚ recycling plant, and each load leaves with its details.

The skip from your property

Licensed ΑΕΚΚ facilityThe load is sorted

  • Concrete, bricks, tilescrushed into recycled aggregate
  • Metal and timberrecycling
  • What is leftlandfill
Where the waste goes after we collect the skip.

If you need papers for a permit, tell us when you book, in the order comment or in the chat. Say which document you want and the name and address to issue it to. Sizes and prices are under skip hire prices. If a contractor runs the job, the guide for builders and tradesmen is worth a look too.

Frequently asked questions

What does ΑΕΚΚ mean?

ΑΕΚΚ stands for Απόβλητα Εκσκαφών, Κατασκευών και Κατεδαφίσεων: waste from excavation, construction and demolition. That means the rubble and other materials from digging, building, renovating or demolishing, such as concrete, tiles, wood and metal. They have codes in chapter 17 of the European Waste Catalogue.

What is the ΣΔΑ in a building permit?

The ΣΔΑ is the waste management data, the form that states what ΑΕΚΚ the project will produce and where it will go. The engineer prepares it, and it goes into the permit file on e-Άδειες before the works start.

Who is responsible for ΑΕΚΚ, the owner or the contractor?

The contractor of the works. If no contractor has been appointed, the owner of the works is responsible, which means you. So ask your contractor which ΣΣΕΔ they use, and ask for copies of the papers.

Do I need a ΣΔΑ for a bathroom renovation with no permit?

No. If the job needs no permit, there is no permit file to put a ΣΔΑ in, and nobody asks you for a paper. Under article 30(4) of Law 4819/2021, though, the rubble must still go to a licensed ΑΕΚΚ plant, not to a stream bed or a plot of land. Keep the receipt from the skip company.

How many ΣΣΕΔ ΑΕΚΚ are there in Greece?

At its update of 24 May 2024, the ΕΟΑΝ page listed 13 active systems. They are regional, and each covers certain regional units. The current list is on eoan.gr.

What is the ΑΕΚΚ receipt of delivery and when do I need it?

It is the paper the ΣΣΕΔ issues for the rubble it received. Your engineer needs it at the end of the works to close the building permit with the building authority. How to ask for it is in the guide to the legal waste carrier.

Is there a recycling target for ΑΕΚΚ?

Yes. Article 25 of Law 4819/2021 requires at least 70% by weight of non-hazardous ΑΕΚΚ to be prepared for re-use, recycled or recovered. Natural material coded 17 05 04 does not count.

Still have a question?

Write to us in the chat at the bottom right — we answer in English, Greek and Russian.

A skip for your project

Enter the address, see the price and book online. Write in the comment which papers you need for the permit.

Order a skip