Three things to ask before you book
Ask before the skip arrives. A proper skip company has these ready and hands them over straight away.
- ΗΜΑ number. The Electronic Waste Registry of the Ministry of Environment and Energy is where companies that handle waste register, with their facilities and their collection and transport activity. Ask for the registration number and the company name.
- Contract with a ΣΣΕΔ ΑΕΚΚ. Construction waste is handled by systems approved by the Hellenic Recycling Agency (ΕΟΑΝ). Ask which system the company works with. If your job has a permit, ask for a copy of the contract too.
- Receipt of delivery. The approved system issues it after it takes in the waste. It states the details of the person responsible, the address and the job the waste came from, the categories and the quantities. Ask in advance when and how you will get it.
How to check: ΕΟΑΝ publishes the approved systems and the regional units each one covers on its construction waste page (in Greek). Make sure the system the company named is on the list and covers your area. If you can't find it, ask the company or the system itself.
Give the skip company the exact address of the job and the owner's name. The receipt is issued with these details. If they are wrong, it will need correcting.
Why it matters to you
Somebody is always responsible for the waste. The ministerial decision on construction waste names as responsible parties (διαχειριστές ΑΕΚΚ) the contractor on the job and the company that hires out skips and carries the waste. If you do the job without a contractor, the responsible party is you, as the owner of the works.
You will be asked for the paper in these cases:

- Building permit or small-scale works approval (έγκριση εργασιών μικρής κλίμακας). The file includes the waste management data (ΣΔΑ) and a copy of the signed contract with an approved ΣΣΕΔ ΑΕΚΚ. If the works produce no rubble, an engineer's declaration is enough. Your engineer handles this.
- End of the job. Within 30 days of finishing with the waste, the receipt is filed with the building authority. Where there is a contract with a ΣΣΕΔ, the certificate of completed construction (Πιστοποιητικό Ελέγχου Κατασκευής) is not issued without it.
- A skip on public space. The same decision lists placing skips in public spaces among the permits where waste details are required. What your own municipality asks for a skip on the street is in the guide to municipal skip permits.
- Inspections. The systems keep a register of where each load came from and how much it was, and pass the data to ΕΟΑΝ and the Region when asked. In an inspection, the receipt shows where your waste went.
The law sets administrative fines for illegal dumping of waste. We don't quote amounts here because they have changed with amendments to the law. What matters to you is simpler: if your rubble turns up in a stream bed or a field and you have no paper, it is hard to prove you handed it to a legal skip company.
Signs that something is wrong
- He won't give you a company name and tax number (ΑΦΜ). All you have is a first name and a mobile number.
- Cash only, no receipt or invoice.
- Asked where the waste goes, he is vague: "to a plot", "we sort it out".
- The price is far below the market. Transport and delivery to a recycling facility cost money. When the price doesn't cover that, the waste usually ends up somewhere else. Market prices are in skip hire prices.
- He takes anything without asking: asbestos, oil, paint, batteries. These don't go in a rubble skip, and asbestos needs a licensed removal crew. See what goes in a skip.
- The truck carries no company details anywhere.
How Skipaki handles it
We bring the skip and take it away. You pay when the skip arrives; nothing is charged online.
Every order is carried out under an ΗΜΑ registration and a contract with a ΣΣΕΔ ΑΕΚΚ. The waste goes to an ΑΕΚΚ recycling facility in the area.
The skip from your property
Licensed ΑΕΚΚ facilityThe load is sorted
- Concrete, bricks, tilescrushed into recycled aggregate
- Metal and timberrecycling
- What is leftlandfill
Ask for the receipt of delivery when we collect the skip. If you need it for a permit, say so from the start in the order comment or in the chat, so we know which details to declare.
Before you fill the skip, check what goes in and what doesn't. If the skip will stand on the street, you or your contractor get the permit to occupy public space: see municipal skip permits.
Legal basis
- Joint Ministerial Decision 36259/1757/Ε103/2010 (ΦΕΚ 1312/Β/24-08-2010): management of construction waste, duties of the responsible parties and the receipt of delivery.
- Law 4819/2021 (Α΄ 129): the waste management framework and the administrative sanctions (article 69, as in force).
- Law 4495/2017, articles 40, 41 and 47, as amended: documents for a building permit and a small-scale works approval, and the receipt for the certificate of completed construction.
- Electronic Waste Registry (ΗΜΑ) of the Ministry of Environment and Energy.
- ΕΟΑΝ: construction waste, with the approved ΣΣΕΔ ΑΕΚΚ, and the construction waste legislation.
All sources are in Greek. This is general information, not legal advice. For your own job, ask your engineer or the building authority.
