What size skip do I need

One bathroom fits in a 3 m³ mini skip. A whole flat needs the 8 m³ skip, usually twice. Furniture, timber and prunings go in a 10 or 12 m³. With heavy rubble, weight decides before volume: concrete, tiles and soil reach the weight limit long before a big skip is full, so you take a smaller one.

Updated:

Orange skips of three sizes standing side by side in a yard

The sizes we have

There are five sizes in all, and each city has three of them. The table shows how much room each one takes on the street, what job it is for and where you can get it.

  • 3 m³2.5 × 1.4 m

  • 6 m³3.5 × 1.5 m

  • 8 m³3.8 × 1.6 m

  • 10 m³4 × 1.8 m

  • 12 m³4 × 1.8 m

A person, 1.75 m

Side view, drawn to scale. Length × width are approximate.
SizeAbout L × WStreet spaceTypical jobWhere
3 m³ mini skip2.5 × 1.4 m1 parking spaceOne bathroom, a small kitchen, a storeroomAthens, Patras, Larissa, Volos
6 m³ skip3.5 × 1.5 m1 parking spaceA kitchen and a bathroom together, plaster and tiles from a few roomsAthens
8 m³ skip3.8 × 1.6 m2 parking spacesA whole flat, the furniture of a house, a big gardenAll six cities
10 m³ skip4 × 1.8 m2 parking spacesFurniture, mattresses, timber, prunings, packagingThessaloniki, Heraklion, Patras, Larissa, Volos
12 m³ skip4 × 1.8 m, taller sides2 parking spacesA house or shop emptied, light waste onlyThessaloniki, Heraklion

The cubic metres are approximate. A “7.5” and an “8” are the same skip, and so are a “3” and a “3.5”. A mini skip is about 1 m high and an 8 m³ about 1.5 m, which matters when you load by hand.

How much waste your job makes

Tick what you are doing and how many times. The numbers are for waste already broken up, which takes more room than the wall or floor it came from.

  • Bathroom stripped out

    one bathroom of about 4–5 m² · 2–4 m³

    0
  • Kitchen taken out

    units, worktop, wall tiles · 3–5 m³

    0
  • Floor tiles lifted

    per 10 m² of floor, with the adhesive · 0.6–0.8 m³

    0
  • Brick wall knocked down

    per 10 m² of wall · 1–1.4 m³

    0
  • Whole flat renovated

    flat of about 70 m² · 12–20 m³

    0
  • Flat or house cleared out

    furniture and belongings, about 70 m² · 8–15 m³

    0
  • Storeroom or basement emptied

    one storeroom · 3–8 m³

    0
  • Garden cleared

    prunings and green waste of a yard · 3–8 m³

    0

Tick at least one job.

Tick the jobs you are doing and how many times: two bathrooms, 30 m² of floor tiles, one storeroom. The calculator adds up the cubic metres and suggests a size. The numbers are for broken material, which takes more room than it did in the wall.

  • If most of it is heavy rubble, it tells you. Then a big skip is filled only to about half, or you take two smaller ones.
  • If the total is more than the largest skip, it suggests two skips or swapping the full one for an empty one.
  • Under 1 m³ it points you to rubble bags, which cost less than a skip.

When you aren’t sure, go with the higher number. A skip that fills up halfway through the job means a second order, while a bit of room left over costs you nothing.

How much waste each job makes

JobWaste, m³Which skip
Bathroom stripped out, 4–5 m²2–43 m³ mini, or 8 m³ where there is no mini
Kitchen taken out3–56 or 8 m³
Floor tiles with adhesive, per 10 m²0.6–0.8For 40 m² of floor, a 3 m³ mini
Brick wall knocked down, per 10 m²1–1.4Heavy rubble: a smaller skip
Whole flat renovated, about 70 m²12–20Two 8 m³ skips, or one swapped full for empty
Flat or house cleared out, about 70 m²8–1510 or 12 m³. In Athens, an 8 m³ and a swap
Storeroom or basement emptied3–83 to 8 m³, depending on the storeroom
Garden cleared3–88 m³, or 10 m³ for a lot of prunings
A man tipping a wheelbarrow of rubble into a skip
An 8 m³ skip is about 1.5 m high, a mini skip about 1 m. It matters when you load by hand.

To work it out more closely, each square metre you strip out gives about: floor tiles with adhesive 0.06–0.08 m³, wall tiles 0.04–0.06, plaster 2 cm thick 0.03–0.04, brick wall 0.10–0.14, concrete 10 cm thick 0.13–0.16. Multiply by the square metres and add whatever else comes out: doors, cupboards, the toilet and basin.

Bulking and weight: why rubble needs a smaller skip

A wall in place is solid. Once it is broken, air is left between the pieces and the rubble takes 30–60% more room. Tiles grow by about 30%, bricks and plaster by about 40%, concrete by 50–60%, soil by 20–30%. The calculator above already counts this.

How much more room broken material takes

  • Soil+20–30%
  • Tiles+30%
  • Bricks and plaster+40%
  • Concrete+50–60%
  • in place
  • broken up
A wall in place is solid. Once it is broken, air is left between the pieces.
MaterialWeight per m³
Mixed building rubble1.2–1.6 t
Concrete, marble, stone1.8–2.4 t
Soil1.5–1.9 t
Furniture0.1–0.3 t

Do the sum: an 8 m³ skip full of mixed rubble weighs 10–13 tonnes. That is more than the lorry can lift. So with heavy rubble an 8 m³ skip is filled to about half, and with concrete or soil a little less. A 3 m³ mini skip of rubble comes to roughly 4–5 tonnes, which is why it is the skip people take for a bathroom.

The 10 and 12 m³ skips take light waste only: furniture, mattresses, timber, prunings, packaging. With rubble in it the skip can’t be lifted and stays where it is. For a renovation with a lot of rubble, take two smaller skips or ask for a swap.

  • Heavy rubble in an 8 m³ skip: to about half

  • Rubble first, light waste on top, up to the rim

  • Nothing above the rim

Concrete, tiles, bricks and soil reach the lorry’s weight limit long before the skip looks full.

If you have heavy and light waste together, put the rubble in first, spread over the whole floor, up to about half. Then the light waste on top, up to the rim. Write in the order comment what is in it.

Why the sizes differ from city to city

In each city we run the skips its streets need. The form shows what is available at your address.

  • Athens: 3, 6 and 8 m³. In the centre, in Koukaki, Exarchia and Psyrri, the streets are narrow and parking is scarce, so often only the 3 m³ mini skip fits. The 6 m³ is the in-between size for a kitchen and a bathroom. The 8 m³ is the usual skip in the suburbs, with wider streets and yards. For bigger jobs in Athens you take a second 8 m³ or a swap.
  • Thessaloniki and Heraklion: 8, 10 and 12 m³. There are no mini skips here; the smallest is 8 m³. For a bathroom you take the 8 m³ and fill it with whatever you have. Under 1 m³, rubble bags cost less. The 10 and 12 m³ are for light, bulky waste.
  • Patras, Larissa and Volos: 3, 8 and 10 m³. A mini skip for the bathroom, the standard 8 m³ for bigger jobs, and a 10 m³ for furniture and prunings.

Two skips or one big one

Two smaller skips, or one skip swapped full for empty, work better than one big skip when:

  • Most of it is heavy rubble. An 8 m³ skip swapped once or twice takes the rubble of a whole flat without going over the weight limit.
  • The street has room for one parking space. Two mini skips, one after the other, fit where an 8 m³ skip doesn’t.
  • The work goes in stages. First the strip-out, then the old furniture a few weeks later. One skip per stage, so none stands empty running up days.
  • You want the rubble apart from the light waste. One skip for rubble, another for furniture and prunings, so each one is filled properly.

A swap means we take the full skip and leave an empty one in the same spot. Ask for it in the chat when the skip is nearly full.

Skip sizes: common questions

How many bags fit in a 3 m³ skip?

About 90 rubble bags. Some 30 bags make 1 m³. An 8 m³ skip takes around 250–270 bags.

What size skip do I need for a bathroom?

The 3 m³ mini skip. A bathroom of 4–5 m² makes 2–4 m³ of rubble. In Thessaloniki and Heraklion, where the smallest skip is 8 m³, take that one and you have room for anything else.

What size skip for renovating a whole flat?

A flat of about 70 m² makes 12–20 m³, mostly heavy rubble. Take an 8 m³ skip and plan for two, or one swap of the full skip for an empty one. With rubble you fill the skip to about half.

Can rubble go in a 12 m³ skip?

No. The 10 and 12 m³ skips are for light waste only, like furniture, timber and prunings. Full of rubble they weigh so much that the lorry can’t lift them. For rubble take the 8 m³ skip or a smaller one.

How much room does a skip take on the street?

The 3 m³ mini skip takes one parking space, about 2.5 × 1.4 m. The 8 m³ skip takes two. Next to it the lorry needs room to stop. On the street you also need a municipal permit: see Skip permits by municipality.

What if the skip turns out too small?

Write to us in the chat and ask for a swap of the full skip for an empty one, or order a second skip. Don’t load above the rim: whatever sticks out has to come off before the skip leaves.

Still have a question?

Write to us in the chat at the bottom right — we answer in English, Greek and Russian.

Order the size you need

Enter the address and see which sizes your area has, with the final price.

Order a skip